University of Westminster
Client: Harrow Campus – 5 year ongoing framework
Beveridge Associates have an ongoing 5 year framework, and have successfully completed numerous asset replacement, remodelling and refurbishment projects, including:
TV, Radio and recording studios
- Conversion of office area into TV studio teaching space
- Refurbishment/remodelling of Radio Studios
- Installation of enhanced air condition to recording studios
Student halls
- New domestic water installation, including solar thermal
- Extensive PV Arrays
- Refurbishment of student kitchens
- Remodelling and refurbishment of student common room.
- New door access system
- Replacement of fire alarm system
- Replacement of lighting with new LED luminaires
- External decoration and replacement rainwater goods
Department fit-out
- Refurbishment and fit-out of new fashion studio.
- Refurbishment of Block J “news room”
- Auditorium refurbishment (before)
Plant/system replacement schemes
- Chiller replacements (Block J, L and M)
- Boiler replacement sports block and Chiswick Park sports ground
- Domestic water plant and pipework blocks A, B, C and G
- External sports lighting at Chiswick Park
- Campus wide intruder alarm system
- New electric vehicle charging
















