University of Westminster

Client: Harrow Campus – 5 year ongoing framework

Beveridge Associates have an ongoing 5 year framework, and have successfully completed numerous asset replacement, remodelling and refurbishment projects, including:

TV, Radio and recording studios

  • Conversion of office area into TV studio teaching space
  • Refurbishment/remodelling of Radio Studios
  • Installation of enhanced air condition to recording studios

Student halls

  • New domestic water installation, including solar thermal
  • Extensive PV Arrays
  • Refurbishment of student kitchens
  • Remodelling and refurbishment of student common room.
  • New door access system
  • Replacement of fire alarm system
  • Replacement of lighting with new LED luminaires
  • External decoration and replacement rainwater goods

Department fit-out

  • Refurbishment and fit-out of new fashion studio.
  • Refurbishment of Block J “news room”
  • Auditorium refurbishment (before)

Plant/system replacement schemes

  • Chiller replacements (Block J, L and M)
  • Boiler replacement sports block and Chiswick Park sports ground
  • Domestic water plant and pipework blocks A, B, C and G
  • External sports lighting at Chiswick Park
  • Campus wide intruder alarm system
  • New electric vehicle charging

Back to projects