Multi-Site Stage 1 and 2 Surveys
Client: Department for Education (Via Mace and William Martin)
Beveridge Associates have undertaken numerous surveys of schools and are regularly approached to undertake repeat commissions.
Working closely with Mace and William Martin, we have completed detailed condition surveys at more than 20 schools, identified as requiring high priority works.
Working to a brief prepared by the DfE, sites were located around the country, from Kent to North Yorkshire.
Surveys are detailed in nature, with deliverables including asset schedules, location and route drawings, power load and water demand logging, review of maintenance and servicing, outline energy assessment.
